Track renewal work is taking place between Balcombe and Haywards Heath. Deliver a heavy load of fresh ballast to the worksite from Norwood Jn, following behind other passenger services en-route. Year: 2010.
55-minute scenario for the London to Brighton route on Steam.
Requirements:
Armstrong Powerhouse (and their dependencies):
– Signal EP;
– Class 378 EP;
– JNA-C wagons.
Steam:
– Class 70;
– Class 460;
Credits:
ChiefJack – Worksite limit board
TSRollingStock – JNA-C sleeper wagon load






